De Minimis API

The De Minimis API provides data about the De Minimis amount and the Value Added Tax (VAT) amount that products may be subject to when exported to foreign countries. “De Minimis” is the threshold for a product’s value below which no duty or tariff is…

GC-MS Screening Data for Instrument Optimization

The objective of this example case was to maximize peak height and minimize peak width of 11 iodinated standards analyzed using gas chromatography-mass spectrometry (GC-MS). Seven parameters (split ratio, carrier gas flow rate, inlet temperature, injection volume, auxiliary line temperature, oven temperature ramp rate, and…

T-100 Domestic Market and Segment Data

The T-100 Domestic Market and Segment Data dataset was downloaded on April 08, 2025 from the Bureau of Transportation Statistics (BTS) and is part of the U.S. Department of Transportation (USDOT)/Bureau of Transportation Statistics (BTS) National Transportation Atlas Database (NTAD). It shows 2024 statistics for…

CFS Export File 2012-2022

This is the CFS export file. It describes geographic movements of all exported commodities and includes breakdowns by mode, NAICS, commodity, shipping distance, shipment weight. It includes estimates for tonnage, value, average mile per shipment (Geomiler estimate (2012 and 2017) or GCD (2022))

CFS Area File 2012-2022

This is the CFS area file. It describes geographic movements of all commodities and includes breakdowns by mode, NAICS, commodity, shipping distance, shipment weight. It includes estimates for tonnage, value, average mile per shipment (Geomiler estimate (2012 and 2017) or GCD (2022))

Reference functional model for production in a circular economy

Reference functional model for the activities and processes involved in production (e.g., designing, manufacturing, and recovering products/materials) in a circular economy. The model includes inputs and outputs of each activity, as well as factors that constrain and enable the activities (controls and mechanisms), using the…

Feed-in Tariff Solar Program

Quarter-Year Installed Capacity from the Feed-in Tariff (FiT) Program in Kilowatts. The FiT program enables third parties to develop solar or other renewable energy and sell the power to the utility. This is a relatively new program with projects in the beginning stages.